Master Parts List

Below is the complete master list of all parts and tools required to build the various components used in The Electric Brewery. This is a compilation of all the parts and tools that we list in the individual Building Your Brewery guides.

In some cases more than one option may be presented. For complete details please refer to the individual guides as they explain these options in greater detail.

Don't want to build it yourself or having problems finding a part? See our shop as we offer various products and kits.

Happy building!

Purchasing through our affiliate links helps support our site at no extra cost to you. We thank you!

 

Kettles

Choose your kettle size based on the amount of beer you wish to brew:

Brew up to 5 gallons per batch:

Brew up to 10 gallons per batch (recommended):

Brew up to 15 gallons per batch:

Brew up to 31 gallons (1 barrel) per batch:

Brew up to 62 gallons (2 barrels) per batch:

You'll also need the following tools:

Note: In late 2014 Blichmann redesigned their kettles calling them the "BoilerMaker G2" and changed the standard ball valve for a proprietary "linear flow" valve. We recommend this be replaced. (Complete details and instructions)

 

Heating Elements

To purchase heating elements pre-assembled or in kit form, see our shop.

The following parts are needed:

You'll also need the following tools:

 

Temperature Probes

To purchase temperature probes pre-assembled or in kit form, see our shop.

The following parts are needed:

You'll also need the following tools:

*The probe with 1/2" NPT thread is recommended as it will not require a bushing (reducer) to fit in 1/2" plumbing. This is a newer probe that has only recently become available.

 

Hot Liquor Tank

The following parts are needed:

You'll also need the following tools:

*The bushing (reducer) is only required if a temperature probe with 1/4" NPT thread is used. If the recommended probe with 1/2" NPT thread is used, no bushing is required.

 

Mash/Lauter Tun

The following parts are needed:

You'll also need the following tools:

*The bushing (reducer) is only required if a temperature probe with 1/4" NPT thread is used. If the recommended probe with 1/2" NPT thread is used, no bushing is required.

 

Boil Kettle

The following parts are needed:

You'll also need the following tools:

 

Brew Stand

If you're looking for something more industrial than wood, consider a 24 x 60 inch stainless steel commercial work table with a lower shelf. It is the perfect size for 20 gallon kettles and is what we use now in our newly built (larger) brewery.

The following parts are needed:

You'll also need the following tools:

 

Hoses

The following parts are needed:

You'll also need the following tools:

 

Pumps

The following parts are needed:

You'll also need the following tools:

 

Wort Chiller

The following parts are needed:

Source of water:

You'll also need the following tools:

 

Control Panel (Standard 30A with safe start interlock)

To purchase a control panel pre-assembled or in kit form, see our shop.

For different versions or to adapt for 220-240V countries see the alternate control panel builds in our Building Your Brewery guides.

The following parts are needed:

Source of power and power cord:

You'll also need the following tools:

*Not required if building from one of our control panel kits. Our kit enclosures are custom made for us and result in less work for you. There is no need to move the ground post, no need to seal and sand the bottom cable plate, and no need to prime and paint as the enclosure is already professionally powder coated with an industrial flat textured charcoal/black finish.

**You likely already have extra unused NC contact blocks from the various switches you already purchased.

***The hole sizes will vary slightly based on the receptacle brand used. Before cutting, confirm the hole sizes required by measuring the actual receptacles you will be installing.

****Not required if you are building from one of our control panel kits and you opted to have the enclosure pre-punched.

 

Ventilation

The following parts are needed:

You'll also need the following tools:

 

Grain Mill

The following parts are needed:

You'll also need the following tools:

 

Some sellers do not ship outside the USA. If you live outside the USA (like us), we recommend using a forwarding service such as Shipito. We've used them to ship to Canada. The good news is that shipping within the USA is very inexpensive or often free. You then simply pay a small forwarded fee plus the cost of whatever shipping method you choose (USPS, FedEx, etc.). They will even consolidate multiple packages into one to save on shipping. We recommend USPS whenever possible to minimize brokerage fees.

Purchasing through our affiliate links helps support our site at no extra cost to you. We thank you!